#71503: "A lot more automation in production phase through pre-planning"
Mitä tämä raportti koskee?
Mitä tapahtui? Valitse alta
Mitä tapahtui? Valitse alta
Ennen ilmoituksen tekoa, tarkista onko sellainen jo olemassa samasta aiheesta
Jos kyllä, ole ystävällinen ja ÄÄNESTÄ tätä raporttia. Eniten ääniä saaneet raportit laitetaan ETUSIJALLE!
| # | Status | Votes | Game | Type | Title | Last update |
|---|
Tarkka kuvaus
-
• Kopioi/liitä virheilmoitus näytöltäsi, jos sait sellaisen.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• Selitä mitä halusit tehdä, mitä teit ja mitä tapahtui
• Mikä on selaimesi?
Google Chrome v102
-
• Ole hyvä ja kopioi teksti englanniksi oman kielesi sijasta. Jos sinulla on kuvakaappaus tästä bugista (hyvä käytäntö), voit käyttää valitsemaasi kuvien isännöintipalvelua (snipboard.io ladataksesi sen ja kopioidaksesi/liittääksesi linkin tähän. Onko tämä teksti saatavilla käännösjärjestelmässä? Jos on, onko sen käännöksestä yli 24 tuntia?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Mikä on selaimesi?
Google Chrome v102
-
• Selitä ehdotuksesti tarkasti ja ytimekkäästi, jotta se on ymmärrettävissä niin helposti kuin mahdollista.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Mikä on selaimesi?
Google Chrome v102
-
• Mitä näytöllä näkyi kun olit estettynä (Tyhjä ruutu? Osa pelin käyttöliittymästä? Virheilmoitus?)
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Mikä on selaimesi?
Google Chrome v102
-
• Mitä osaa säännöistä BGA:n sovellus ei noudattanut
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• Onko sääntörikkomus nähtävillä pelin toistossa? Jos kyllä, mikä on siirron numero?
• Mikä on selaimesi?
Google Chrome v102
-
• Minkä pelin toiminnon halusit suorittaa?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• Mitä yritit tehdä tämän pelitoiminnon käynnistymiseksi?
-
• Mitä tapahtui kun yritit tehdä tämän (virheilmoitus, pelin tilapalkin viesti, ...)?
• Mikä on selaimesi?
Google Chrome v102
-
• Missä vaiheessa peliä ongelma ilmeni (mikä oli silloinen pelin ohje)?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• Mitä tapahtui kun yritit tehdä tämän pelin toiminnon (virheilmoitus, pelin tilapalkin viesti, ...)?
• Mikä on selaimesi?
Google Chrome v102
-
• Kuvaile näyttöongelmaa. Jos sinulla on kuvakaappaus tästä bugista (hyvä käytäntö), voit käyttää valitsemaasi kuvien isännöintipalvelua (snipboard.io ladataksesi sen ja kopioidaksesi/liittääksesi linkin tähän.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Mikä on selaimesi?
Google Chrome v102
-
• Ole hyvä ja kopioi teksti englanniksi oman kielesi sijasta. Jos sinulla on kuvakaappaus tästä bugista (hyvä käytäntö), voit käyttää valitsemaasi kuvien isännöintipalvelua (snipboard.io ladataksesi sen ja kopioidaksesi/liittääksesi linkin tähän. Onko tämä teksti saatavilla käännösjärjestelmässä? Jos on, onko sen käännöksestä yli 24 tuntia?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Mikä on selaimesi?
Google Chrome v102
-
• Selitä ehdotuksesti tarkasti ja ytimekkäästi, jotta se on ymmärrettävissä niin helposti kuin mahdollista.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Mikä on selaimesi?
Google Chrome v102
Raportin historia
This could be auto-placement of produced cube if there is only one card that needs it.
Or we could set *one* card to auto-build in priority and cubes would automatically go to it.
Lisää jotain tähän raporttiin
- Toinen pöydän tunnus / siirron numero
- Ratkaisiko F5 ongelman?
- Ilmestyykö ongelma useita kertoja? Joka kerta? Satunnaisesti?
- Jos sinulla on kuvakaappaus tästä bugista (hyvä käytäntö), voit käyttää valitsemaasi kuvien isännöintipalvelua (snipboard.io ladataksesi sen ja kopioidaksesi/liittääksesi linkin tähän.
